For faster navigation, this Iframe is preloading the Wikiwand page for Tandang Sora station.

Tandang Sora station

Tandang Sora
Tandang Sora station construction progress as of March 2023
General information
LocationCommonwealth Avenue,
Matandang Balara and New Era,
Quezon City, Metro Manila
Philippines
Coordinates14°39′48″N 121°04′03″E / 14.66342°N 121.06742°E / 14.66342; 121.06742
Owned bySMC-Mass Rail Transit 7 Incorporated
Line(s)     MRT Line 7
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
Platform levels2; one concourse and one platform
AccessibleYes
Other information
StatusUnder construction
Station codeTS
History
Opened2025
Services
Preceding station Manila MRT Following station
University Avenue
towards North EDSA
MRT Line 7 Don Antonio

Tandang Sora station is an under-construction Metro Rail Transit (MRT) station located on the MRT Line 7 (MRT-7) system along Commonwealth Avenue in Matandang Balara and New Era, Quezon City.

The Tandang Sora Flyover was demolished in March 2019 to give way for the construction of the MRT-7 station.[1]

Nearest landmarks include the Iglesia ni Cristo Central Temple, New Era University and Net 25 TV studios.

The station is named after Melchora Aquino also known as Tandang Sora, one of the key personalities in the Philippine Revolution.

This station should not be confused with the future Tandang Sora Station of the Metro Manila Subway Line 9, to be constructed at the corner of Tandang Sora Avenue and Mindanao Avenue, also in Quezon City.

As of 31 January 2023, the project is 66.07% complete;[2] the station's construction is planned to be finished by June of the same year.[3]

References

[edit]
  1. ^ "MMDA warns of heavy traffic as Tandang Sora Flyover shuts down". UNTV. 2 March 2019. Retrieved 3 March 2019.
  2. ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. 16 February 2023. Retrieved 21 February 2023.
  3. ^ Balinbin, Arjay L. (25 January 2023). "Full MRT-7 operations seen by 2nd quarter 2025". BusinessWorld. Philippines: The Philippine STAR. Retrieved 25 January 2023.
[edit]
{{bottomLinkPreText}} {{bottomLinkText}}
Tandang Sora station
Listen to this article

This browser is not supported by Wikiwand :(
Wikiwand requires a browser with modern capabilities in order to provide you with the best reading experience.
Please download and use one of the following browsers:

This article was just edited, click to reload
This article has been deleted on Wikipedia (Why?)

Back to homepage

Please click Add in the dialog above
Please click Allow in the top-left corner,
then click Install Now in the dialog
Please click Open in the download dialog,
then click Install
Please click the "Downloads" icon in the Safari toolbar, open the first download in the list,
then click Install
{{::$root.activation.text}}

Install Wikiwand

Install on Chrome Install on Firefox
Don't forget to rate us

Tell your friends about Wikiwand!

Gmail Facebook Twitter Link

Enjoying Wikiwand?

Tell your friends and spread the love:
Share on Gmail Share on Facebook Share on Twitter Share on Buffer

Our magic isn't perfect

You can help our automatic cover photo selection by reporting an unsuitable photo.

This photo is visually disturbing This photo is not a good choice

Thank you for helping!


Your input will affect cover photo selection, along with input from other users.

X

Get ready for Wikiwand 2.0 🎉! the new version arrives on September 1st! Don't want to wait?