For faster navigation, this Iframe is preloading the Wikiwand page for Marshall and East Texas Railway.

Marshall and East Texas Railway

The Marshall and East Texas Railway, now defunct, was an American shortline railway based in Marshall, Texas.

Marshall & East Texas Railway
Marshall_and_East_Texas_Railway_Passenger_Train
Overview
HeadquartersMarshall, Texas
LocaleEast Texas
Dates of operation1908-1918
Technical
Track gauge4 ft 8½ in (1,435 mm) standard gauge

History

[edit]

The Marshall and East Texas Railway Company was charted on August 17, 1908, to purchase the Texas Southern Railway. The railway extended from Winnsboro to Marshall, Texas, a total length of 72.5 mi (116.7 km). In 1909, the railway extended the line from Marshall to Elysian Fields, Texas, adding 19 mi (31 km) to the railway's length.

On Monday October 18, 1915, passenger train #2 derailed off a trestle a few miles east of Harleton at around 5:20 p.m. The train consisited of locomotive No. 57, combine car No. 1, and coach car No. 2. The train crew consisted of engineer Barney Clark, fireman Willie Law, conductor Cliff Riden, porter Joe Jenkins, and newsbutch Joe Miller. The two passenger cars landed upside down in the muck, while the locomotive didn't derail at all. 11 people were injured, and conductor Cliff Riden would later pass away from his injuries on Friday October 22, 1915.[1] The M&ET had a special train out of Marshall with a number of doctors and nurses to help treat the injured. In response to his death, the Riden family sued the railway. With lumber being depleted off the line and the lawsuit, the railway went into receivership on January 25, 1917, with Bryan Snyder appointed receiver.[2] In July of that year, the M&ET was put up for auction, with no bidders. The segment of line between East Winnsboro and Gilmer was sold to the Winnsboro and Gilmer Railroad Company, but this railroad never operated and forfeited in 1923. The segment between Marshall and Elysian Fields was sold to the Marshall, Elysian Fields and Southeastern Railway, which operated between 1922 and 1945. The rolling stock was either sold off or scrapped and the only known surviving piece of rolling stock from the M&ET is coach #5 which is currently located at the Pacific Southwest Railway Museum in Campo, California.[3] Two miles (3.2 km) of track and the Marshall terminal were sold to the Texas and Pacific Railway.

Marshall and East Texas Railway Map and Timetable
Marshall and East Texas Railway Pass
M&ET Wreck

References

[edit]
  1. ^ Hammond, Murry. "Short Line to Elysian Fields: The Marshall, Elysian Fields & Southeastern Railway, 1922-1945". Texas Transportation Archive.
  2. ^ "Short Line to Elysian Fields: The Marshall, Elysian Fields & Southeastern Railway, 1922-1945". Texas Transportation Archive.
  3. ^ "DARDANELLE & RUSSELLVILLE RAILROAD #14". Pacific Southwest Railway Museum Association.
{{bottomLinkPreText}} {{bottomLinkText}}
Marshall and East Texas Railway
Listen to this article

This browser is not supported by Wikiwand :(
Wikiwand requires a browser with modern capabilities in order to provide you with the best reading experience.
Please download and use one of the following browsers:

This article was just edited, click to reload
This article has been deleted on Wikipedia (Why?)

Back to homepage

Please click Add in the dialog above
Please click Allow in the top-left corner,
then click Install Now in the dialog
Please click Open in the download dialog,
then click Install
Please click the "Downloads" icon in the Safari toolbar, open the first download in the list,
then click Install
{{::$root.activation.text}}

Install Wikiwand

Install on Chrome Install on Firefox
Don't forget to rate us

Tell your friends about Wikiwand!

Gmail Facebook Twitter Link

Enjoying Wikiwand?

Tell your friends and spread the love:
Share on Gmail Share on Facebook Share on Twitter Share on Buffer

Our magic isn't perfect

You can help our automatic cover photo selection by reporting an unsuitable photo.

This photo is visually disturbing This photo is not a good choice

Thank you for helping!


Your input will affect cover photo selection, along with input from other users.

X

Get ready for Wikiwand 2.0 ๐ŸŽ‰! the new version arrives on September 1st! Don't want to wait?