Escravos GTL

Escravos GTL is a gas to liquids (GTL) project based in Escravos region, Nigeria. It is located in the Niger Delta about 100 kilometres (62 mi) southeast of Lagos. The plant converts natural gas into liquid petroleum products.

History

[edit]

A pre-feasibility study of Escravos GTL was conducted in April 1998, followed by an engineering feasibility study. The Front-End Engineering and Design (FEED) was completed in 2002.[1] At the same year, agreements between Sasol, Chevron Corporation and Nigerian National Petroleum Company were signed.[2] The construction contract was awarded in April 2005 to a consortium of JGC, KBR and Snamprogetti.[1][3]

Description

[edit]

The GTL plant cost US$10 billion and started up in summer 2014; its original cost started out at US$1.9 billion in 2005, rising to US$5.9 billion in 2009 but continued to escalate.[4] It has an initial capacity of 34,000 barrels per day (5,400 m3/d) of synfuel. The plant uses the Fischer–Tropsch process technology and Chevron's ISOCRACKING technology.

[1] More than 325 million cubic feet of natural gas are converted daily by the Escravos GTL facility into GTL diesel and GTL naphtha. The CNL Escravos Gas facility Phase I (EGP-1) and the GTL facility are next to each other.[1]

Partners

[edit]

The project was developed by Chevron Nigeria Limited (75%) and the Nigerian National Petroleum Company (15%).[1] Sasol gained interest in the project early on, acquiring half of Chevron Nigeria's stake; however, due to increased cost and delays, Sasol reduced its stake to 10% in late 2008.[5]

References

[edit]
  1. ^ a b c d "Escravos Gas-to-Liquids Project, Niger Delta, Nigeria". Hydrocarbons Technology. SPG Media Limited. Retrieved 2009-08-02.
  2. ^ "SasolChevron signs agreement for Escravos GTL plant". Gas-to-Liquids News. 2002-05-01. Archived from the original on 2012-10-26. Retrieved 2009-08-02.
  3. ^ "KBR unveils Escravos GTL job rejig". Upstream Online. NHST Media Group. 2007-07-30. Retrieved 2009-08-02.
  4. ^ "Chevron's Escravos GTL Late and Costly". Energy Intelligence. 2014-08-13. Retrieved 2014-08-13.
  5. ^ "Chevron's Nigeria GTL plant delayed". Upstream Online. NHST Media Group. 2009-02-27. Retrieved 2009-08-02.

{{bottomLinkPreText}} {{bottomLinkText}}
Escravos GTL
Listen to this article

This browser is not supported by Wikiwand :(
Wikiwand requires a browser with modern capabilities in order to provide you with the best reading experience.
Please download and use one of the following browsers:

This article was just edited, click to reload
This article has been deleted on Wikipedia (Why?)

Back to homepage

Please click Add in the dialog above
Please click Allow in the top-left corner,
then click Install Now in the dialog
Please click Open in the download dialog,
then click Install
Please click the "Downloads" icon in the Safari toolbar, open the first download in the list,
then click Install
{{::$root.activation.text}}

Install Wikiwand

Install on Chrome Install on Firefox
Don't forget to rate us

Tell your friends about Wikiwand!

Gmail Facebook Twitter Link

Enjoying Wikiwand?

Tell your friends and spread the love:
Share on Gmail Share on Facebook Share on Twitter Share on Buffer

Our magic isn't perfect

You can help our automatic cover photo selection by reporting an unsuitable photo.

This photo is visually disturbing This photo is not a good choice

Thank you for helping!


Your input will affect cover photo selection, along with input from other users.

X

Get ready for Wikiwand 2.0 ๐ŸŽ‰! the new version arrives on September 1st! Don't want to wait?