For faster navigation, this Iframe is preloading the Wikiwand page for Brigham Circle station.

Brigham Circle station

Brigham Circle
An inbound train at Brigham Circle station in 2012
General information
LocationHuntington Avenue at Francis Street
Boston, Massachusetts
Coordinates42°20′4.53″N 71°6′13.35″W / 42.3345917°N 71.1037083°W / 42.3345917; -71.1037083
Platforms2 side platforms
Tracks2
ConnectionsBus transport MBTA bus: 39, 66, MIS
Construction
AccessibleYes
History
Rebuilt2001–2003[1]
Passengers
20132,547 (weekday average)[2]
Services
Preceding station MBTA Following station
Fenwood Road Green Line Longwood Medical Area
Location
Map

Brigham Circle station is a station on the light rail MBTA Green Line "E" branch, located just east of Brigham Circle in the Mission Hill neighborhood of Boston, Massachusetts. With raised platforms installed in a 2001-03 renovation, the station is accessible when served by low-floor streetcars.

The two side platforms are staggered, with the outbound platform further west. Crosswalks across Huntington Avenue to the station are present at Brigham Circle (to the outbound platform), between the two platforms, and at Wigglesworth Street (to the inbound platform). East of Brigham Circle, the E branch runs in a dedicated reservation in the median of Huntington Avenue; west of the circle is street running in mixed traffic to the terminus at Heath Street. Because of this, service is often terminated at Brigham Circle due to traffic conditions to preserve service frequency on the remainder of the line. At these times, the parallel 39 bus provides all service west of Brigham Circle. A facing point crossover is located just east of the station, allowing terminating trains to cross over to the inbound platform.[2]

History

[edit]
A streetcar at Brigham Circle station in 1943

Like other surface stops on the median-reservation section of the line, Brigham Circle (Francis Street) station had bare asphalt platforms. In 1972, the MBTA began planning a reconstruction of that section of the line, then scheduled for 1973-74. Three lightly used stops, including one at Wigglesworth Street, were to be closed.[3] The work (minus the footbridge) were eventually done in 1980, when the line was closed to modify the track and wires for the new LRVs. The line was cut back to Symphony on March 21, 1980; it was re-extended to Northeastern (using LRVs) on June 21 and Brigham Circle on September 20.[4] The inbound platform was moved east, with its east end at Wigglesworth Street.

In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility as part of the Light Rail Accessibility Program. The renovation of Brigham Circle - part of a $32 million modification of thirteen B, C, and E branch stations - was completed in 2003.[5][1][6]

As part of a series of service reductions due to a budget crisis, on July 1, 2012 the MBTA began terminating weekend service at Brigham Circle.[4] The cutback was unpopular with local residents, who considered it an unnecessary inconvenience.[7] On October 13, 2012, the cut was quietly reversed by reducing frequency on the branch slightly, thus allowing the same equipment to cover the full line at no additional cost.[8] This was made official with the December 29, 2012 timetable.[4]

References

[edit]
  1. ^ a b "Subway Service". Ridership and Service Statistics. Massachusetts Bay Transportation Authority. October 2003. p. 2.19 – via Internet Archive.
  2. ^ a b "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  3. ^ "Surface Lines Report". Rollsign. Vol. 9, no. 8/9. Boston Street Railway Association. August–September 1972.
  4. ^ a b c Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  5. ^ "MBTA Short Notes" (PDF). TRANSreport. Boston Metropolitan Planning Organization. February 2003. p. 6. Archived from the original (PDF) on January 16, 2011.
  6. ^ "Planned Accessibility Projects - On Board the Green Line". Massachusetts Bay Transportation Authority. Archived from the original on August 10, 2004.
  7. ^ Fox, Jeremy (30 June 2012). "Loss of weekend E train service worries riders". Boston Globe. Retrieved 23 February 2015.
  8. ^ Rocheleau, Matt (28 December 2012). "MBTA reinstates weekend trolley service for entire E branch of the Green Line". Boston Globe. Retrieved 23 February 2015.
[edit]

Media related to Brigham Circle station at Wikimedia Commons

{{bottomLinkPreText}} {{bottomLinkText}}
Brigham Circle station
Listen to this article

This browser is not supported by Wikiwand :(
Wikiwand requires a browser with modern capabilities in order to provide you with the best reading experience.
Please download and use one of the following browsers:

This article was just edited, click to reload
This article has been deleted on Wikipedia (Why?)

Back to homepage

Please click Add in the dialog above
Please click Allow in the top-left corner,
then click Install Now in the dialog
Please click Open in the download dialog,
then click Install
Please click the "Downloads" icon in the Safari toolbar, open the first download in the list,
then click Install
{{::$root.activation.text}}

Install Wikiwand

Install on Chrome Install on Firefox
Don't forget to rate us

Tell your friends about Wikiwand!

Gmail Facebook Twitter Link

Enjoying Wikiwand?

Tell your friends and spread the love:
Share on Gmail Share on Facebook Share on Twitter Share on Buffer

Our magic isn't perfect

You can help our automatic cover photo selection by reporting an unsuitable photo.

This photo is visually disturbing This photo is not a good choice

Thank you for helping!


Your input will affect cover photo selection, along with input from other users.

X

Get ready for Wikiwand 2.0 🎉! the new version arrives on September 1st! Don't want to wait?